Ngoc Van Industrial Cluster – Project Overview 2026: Location, Infrastructure, Lot List & Investment Opportunities

Ngoc Van Industrial Cluster is a 50-year industrial land lease project located in Ngoc Thien Commune, Bac Ninh Province – situated within the key economic corridor of Hanoi – Hai Phong – Bac Ninh. Total area of 66 hectares, full legal compliance, synchronized technical infrastructure currently under construction. Phase 1 is now opening 12 lots at an early bird price of 110 USD/m².

 

📌 DOWNLOAD BROCHURE ENGLISH LANGUAGE.

 

CCN Ngoc Van Brochure

📋 Project Overview Information

Field Details
Project Name Ngoc Van Industrial Cluster
Developer Koral Bac Giang Industrial Cluster Investment Development JSC
Location Ngoc Thien Commune, Bac Ninh Province
Total Area 66 ha (Phase 1: 30 ha | Phase 2: 36 ha)
Phase 1 Lots (Batch 1) 12 lots – area from 7,524 m² to 20,756 m²
Lease Type Sub-lease of land use rights & technical infrastructure
Lease Term 2024 – 2074
Unit Price (Early Bird) 110 USD/m² – exchange rate: bank selling rate at time of signing
General Contractor PETROCONS DONG DO – Dong Do Petroleum JSC
Current Legal Status IPC Establishment Decision ✔ | Investment Policy Approval ✔ | EIA Approved ✔ | Detailed Plan 1/500 ✔ | Construction Permit ✔
Hotline 0707 766 868

CCN Ngoc Van Brochure3
CCN Ngoc Van Brochure3

📍 Strategic Location & Connectivity

Ngoc Van IPC is situated in the Hanoi – Hai Phong – Bac Ninh economic triangle, the key industrial development corridor in northern Vietnam. Ideal for export manufacturing supply chains, regional labor access, and international logistics.

Distance Strategic Significance
Bac Ninh City: 24 km Samsung, LG, Foxconn industrial hub
Hanoi Capital: 60 km Vietnam’s largest consumer market & talent pool
Noi Bai International Airport: 45 km Export cargo & FDI expert access
Hai Phong Port: 114 km Major northern container port
Huu Nghi Border Gate: 126 km Vietnam–China trade corridor
Mong Cai Border Gate: 166 km Coastal economic corridor

CCN Ngoc Van Brochure2

⚡ Synchronized Technical Infrastructure

All technical infrastructure is invested from the outset – tenants can begin production immediately after completing their factory, with no need for separate infrastructure investment.

Infrastructure Item Specifications & Standards
Power & Energy National grid + backup power + renewable energy. 110/35/22 kV substation, stable 24/7 supply.
Water Supply 2,000 m³/day capacity. Source: Thuong River, meets industrial water standards.
Wastewater Treatment Centralized system, 1,100 m³/day, compliant with QCVN standards.
Telecommunications High-speed fiber optic, international internet, IP telephony, cable TV. Ready for high-tech enterprises.
Internal Roads Industrial-standard internal roads with lighting, drainage, and landscaping.
Custom Factory Build Developer supports design and construction per each enterprise’s requirements.

🏭 Suitable Industries

Ngoc Van IPC prioritizes FDI and domestic enterprises in light industry, mid-to-high technology, low pollution – aligned with Bac Ninh Province’s sustainable development orientation.

Industry Description
Textile & Garment Yarn, fabric, export apparel manufacturing
Mechanical Engineering Metal processing, machine manufacturing, components
Electrical Equipment Cable, switchgear, electrical components
Electronics & Semiconductors Electronics assembly, PCB, semiconductor components
Food Processing Packaged food, processed agricultural products
Rubber, Plastic & Packaging Plastic parts, packaging, building materials
Supporting Industries Supply chain support for FDI corporations in Bac Ninh

Competitive advantage: 24 km from Bac Ninh City – where Samsung Electronics, Foxconn, and LG Display operate. Hundreds of Tier 2–3 suppliers need production land within a reasonable radius.

CCN Ngoc Van Brochure

📊 Phase 1 Lot List – Early Bird (Batch 1 – 04/06/2026)

Phase 1 opens 12 industrial land lots with a total area of 140,427.60 m². All lots ready for signing. Average unit price: 110 USD/m².

No. Lot Code Area (m²) Unit Price (USD/m²) Total Value (USD)
1 CN5 11,601.80 110 1,276,198
2 CN6 10,451.00 110 1,149,610
3 CN8 10,701.20 110 1,177,132
4 CN9 12,449.10 110 1,369,401
5 CN10 20,756.30 110 2,283,193
6 CN11 18,837.40 110 2,072,114
7 CN28 8,313.00 110 914,430
8 CN29 9,103.10 110 1,001,341
9 CN31 9,649.40 110 1,061,434
10 CN36 10,979.80 110 1,207,778
11 CN37 7,524.80 110 827,728
12 CN38 10,060.70 110 1,106,677
TOTAL 140,427.60 15,447,036

* Lots not listed above may be flexibly combined for larger area requirements. Contact us for tailored options.

CCN Ngoc Van Brochure9

💳 Payment Schedule Based on Legal Progress

Customers pay only when the corresponding legal conditions are met – minimizing risk for investors.

Tranche % Payment Condition Cumulative
Tranche 1 10% Upon signing the deposit agreement 10%
Tranche 2 40% Within 21 days of contract signing or by 31/7/2026, whichever comes first 50%
Tranche 3 40% Upon signing the Principal Agreement as basis for Party B to apply for investment license at Ngoc Van IPC; developer supports all investment and construction procedures 90%
Tranche 4 5% By 31/3/2027 or when Party B is granted an investment license at Ngoc Van IPC, whichever comes first; both parties sign the land use right sub-lease and infrastructure agreement 95%
Tranche 5 5% When Party A completes the issuance of the Land Use Rights Certificate for the Lot to Party B 100%

✅ Legal Status & Implementation Progress

Legal Item Status
IPC Establishment Decision ✔ Completed
Investment Policy Approval (Bac Ninh Provincial People’s Committee) ✔ Completed
Environmental Impact Assessment Approval ✔ Completed
Detailed Plan 1/500 Approval ✔ Completed
Construction Permit ✔ Completed
Phase 1 Site Clearance (30 ha) ✔ Completed (clear site)
General Construction Contract Signed ✔ June 2026 – Petrocons Dong Do
Phase 1 Infrastructure Construction 🔄 In Progress – Target Q4/2026
Full Project Completion (66 ha) 📅 Target Q4/2026

CCN Ngoc Van Brochure

🎯 Support & Incentives for Land Tenants

  • Legal & Procedures: Developer supports consultation on all land lease procedures, factory construction permits, and environmental procedures.
  • Factory Design: Support for design and construction according to each enterprise’s specific requirements.
  • Financing Access: Partnership with VietinBank to support enterprises in accessing credit facilities.
  • Tax Incentives: Corporate income tax exemption for 4 years, 50% reduction for the next 9 years. Import tax exemption on production machinery and equipment per current regulations.

📌 DOWNLOAD BROCHURE ENGLISH LANGUAGE.


📞 Consultation & Reservation Contact

Phase 1 has only 12 lots with a total area of 140,427 m². This is the only opportunity to access the early bird price of 110 USD/m² before infrastructure completion and price adjustment.

Koral Bac Giang Industrial Cluster Investment Development JSC
📞 Hotline: 0707 766 868
🌐 Website: ngocvanindustrialzone.com.vn

 

👉 Manufacturing Enterprises & Investors: Register for Consultation & Pricing
👉 Brokers: Register as Cooperating Agent
👉 Receive Full Investor Pack